Showing Service Employed: Fabrication

Aerial view of a large industrial building with extensive rooftop equipment. Surrounding area includes construction activity and earth-moving machinery.

Chick-fil-A Hutchins

The facility proudly features a massive 715,000 square foot processing and distribution warehouse. It’s designed with specialized zones including processing & packaging rooms, an ASRS (Automated Storage and Retrieval System)

Go To Page »
A large industrial warehouse with tall metal racks, assorted equipment, boxes, and construction materials scattered on the floor. High ceilings with exposed beams and lighting fixtures are visible.

HEB – Temple

The distribution facility boasts a spacious 318,000 square foot warehouse, which includes a 135,000 square foot ASRS High Bay Freezer Warehouse. Accompanying this is a 105,000 square foot OPM/CPS Freezer,

Go To Page »
Aerial view of a large industrial building under construction, surrounded by a parking lot filled with numerous cars and trucks, set against a backdrop of dense trees.

Project Dark Star

The facility proudly features a 295,000 square foot poultry processing area, with an impressive capability to process 48,000 birds daily. It boasts the largest inline air-chilling tunnel for turkeys in

Go To Page »
heb san antonio penthouse evap photo (1)

HEB – San Antonio

The recent enhancement includes a 351,400 square foot warehouse expansion, composed of a 281,550 square foot cooler. Additionally, there’s a 69,940 square foot dock, equipped with 46 positions for efficient

Go To Page »
Aerial view of a large industrial warehouse complex surrounded by parking lots and roads, set in a rural area with trees in the background.

Publix – Greensboro

The distribution center covers a vast 1,000,000 square feet, featuring a cutting-edge Recirculated Ammonia Refrigeration System complemented by a Glycol Underfloor Heating mechanism. Additionally, the facility boasts 22 field-erected penthouse

Go To Page »
Overhead exterior view of Dot Foods distribution center.

Dot Foods – Mt. Sterling

The facility has been expanded by 109,080 square feet, featuring a 36,440 square foot Gantry and a 65,970 square foot ASRS (Automated Storage and Retrieval System). Additionally, there’s a 6,670

Go To Page »
Aerial view of a large, white-roofed industrial warehouse with adjacent smaller buildings and a sparse parking area under a cloudy sky.

Wegmans – Ashland, VA

The distribution center covers 1,052,700 square feet, with a 433,870 square foot Dry Grocery Building and a 618,845 square foot Perishables Building. It employs a CO2/Ammonia Cascade System for temperature

Go To Page »
Overhead exterior view of Clemens meat processing facility.

Clemens – Hatfield, PA

Spanning an impressive 308,000 square feet, our state-of-the-art Pork Processing Facility stands as a testament to innovation and efficiency in the food industry. This achievement didn’t go unnoticed, as we

Go To Page »
IIAR-International Institute of All-Natural Refrigeration logo
RETA-Refrigerating Engineers & Technicians Association logo
ASHRAE logo
Controlled Environment Building Association logo
Global Cold Chain Alliance logo
NRF-Natural Refrigeration Foundation logo